#. Conching and Wagon Stook

6. #eighbridge

7. Ermakel

$. Flant and Machinery ako.

With regard to item 1. it is also necessery to come to an arrangemmert

wi tds.

Chinese Maritime Cuntou for

Carton at the Canton Bailamy Station.

camisation of Ex

It is alms to be premmed that, on the completion of the Ca27- to-imper Bailmy (or even before its expletion a loop line to consect with the Canton-Fowloon Railway would bring in increasİCİ inorvened receipts.

It is muggested that a loan to the Chinese Section might be made to orun.

above worka be undertaker morii šiosa that mash works and any other necessary provision shel21. ho

It is maggested that the shore of the receipts from through traffic obtained by the Chinese Section be increased from 6% to TE

express condition th

loss and cormiruokiom above mutrakioned

be carried out. The 10. ingresso to the Chinese Section to be solely

umed for the repayment of the loan.

It is suggested that the above very rough idea be worked out

in greater detail to discover whether it is prmeticable.

It may be attamotive to the Chinese because: -

(a) Making the Railway efficient way bring in greater receipts

my

(b) The loan will be paid off by the extra 13% and time they are

met required to raise farther funda.

(a) with the works arsi provisions completed and the lown liquidabad

Kimy

130